Fatoora Phase 2, explained plainly
Phase 2 is called the Integration Phase because that is literally what it is: your invoicing system integrates with ZATCA's Fatoora platform. This guide explains the two document rules that follow from that, what physically travels with every invoice, and how the waves set your date.
Two document rules, split by buyer
Every tax invoice you issue falls into one of two families, and Phase 2 treats them differently. A standard tax invoice — issued to another VAT-registered business, which is most contractor, developer and facilities work — must be cleared by Fatoora before it is issued: your solution sends the invoice XML, ZATCA's platform stamps it, and only the cleared document goes to your customer.
A simplified tax invoice — issued to a household or a consumer, which is most call-out and villa work — is not cleared in advance. Instead it must be reported to ZATCA within 24 hours of issue, and it carries a QR code the customer can scan to verify it. One connection to Fatoora carries both flows; which rule applies is decided by the buyer, never by the job.
What travels with every invoice
This is why cleared documents are never edited. A mistake is corrected with a credit or debit note that references the original — the chain keeps both, and your customer's accountant sees a clean trail instead of a quietly changed number.
- UBL 2.1 XML — the structured format both rules run on; the PDF or printout is a view of it, not the invoice itself.
- A UUID — a unique identifier minted for that document alone.
- The cryptographic stamp (CSID) of your firm's onboarded solution, applied at clearance or reporting.
- A hash of the previous invoice — documents form a chain, so a missing or altered invoice breaks the sequence visibly.
The waves, and the clock you are on
Waves descend by revenue. Wave 24 — above SAR 375,000 in any of 2022–2024 — integrated by 30 June 2026. Wave 25 — above SAR 187,500 in any of 2022–2025, announced 24 July 2026 — integrates by 1 February 2027, and it is the first wave aimed squarely at micro and small firms: SAR 187,500 a year is only about SAR 15,600 a month. ZATCA's roll-out table closes with “additional waves to be announced”, so firms below today's lines should expect a wave of their own rather than an exemption forever.
One date sits next to the deadline like a warning light: ZATCA's fines-and-penalties waiver runs to 31 December 2026. Relief ends a month before Wave 25 integrates — January 2027 is when unprepared firms feel both at once.
Keep reading
ZATCA
Saudi e-invoicing (Fatoora) Phase 2 for small trade firms: the waves, the deadlines, the checker, and what InstaJac…
Read →CSID onboarding
The CSID sequence in order: portal OTP, CSR, compliance stamp, production stamp — and the three places firms get st…
Read →Wave checker
Free checker: enter your VAT-taxable revenue for 2022–2025 and get your Fatoora wave, your threshold and your integ…
Read →Phase 2 readiness ends in a software decision: what your invoicing tool must prove — real UBL XML, managed CSID onboarding, both clearance and reporting — is listed in the software-choosing guide.
Asked often, answered straight.
What is the difference between Phase 1 and Phase 2?+
Phase 1 (from December 2021) required invoices to be generated electronically with the required fields and a QR code on simplified invoices — but nothing connected to ZATCA. Phase 2 connects your solution to Fatoora: clearance and reporting happen live, as invoices are issued.
Can I keep invoicing from a spreadsheet?+
No. Phase 2 invoices must be generated by an e-invoicing solution connected to Fatoora, in UBL 2.1 XML with your cryptographic stamp. A spreadsheet or a word-processor document cannot be cleared or reported, however tidy it looks.
What happens if I miss my wave's deadline?+
Penalties for e-invoicing violations exist under ZATCA's regulations, and the current fines-and-penalties waiver initiative runs to 31 December 2026 — one month before the Wave 25 deadline. The waiver is a reason to regularise now, not a reason to wait: after it closes, the deadline pressure and the penalties arrive together.
My firm works in Arabic — does anything change?+
It applies the same way Phase 2 applies to any taxpayer: the test is VAT-taxable revenue, not the language you work in. Your system needs the connection; your working language is your own choice — InstaJack's Saudi surface is Arabic-first for exactly this reason.